BEN FICKLIN RD over RED ARROYO
0.30 MI N OF S JACKSON RD · County 451, Texas · Built 1937 · 2 Lanes · 1,727 vehicles/day
Overall
Deck
7
Good
Superstructure
7
Good
Substructure
7
Good
Condition Ratings
| Component | Rating | Description |
|---|---|---|
| Deck | 7 | Good |
| Superstructure | 7 | Good |
| Substructure | 7 | Good |
Location
31.429894, -100.44045
This bridge is in worse condition than 52.1% of bridges in County 451. The average bridge in Texas is 0 years old; this one is 89 years old.
Nearby Bridges
US 87 over RED ARROYO
Built 1969
S JACKSON ST over RED ARROYO
Built 1975
FM 1223 over RED ARROYO
Built 1946
FM 1223 over SOUTH CONCHO RIVER
Built 1946
AVE R over DRAIN
Built 1955
US 87 over DRAW
Built 1969
US 87 over DRAW
Built 1969
RIVER FALLS ROAD over DRAW
Built 2005
US 87 (NB) over SOUTH CONCHO RIVER & RD
Built 1972
US 87 (SB) over SOUTH CONCHO RIVER & RD
Built 1972
Bridge Details
- Structure #
- 072260B00620028
- Year Built
- 1937
- Length
- 32.6 m (107 ft)
- Max Span
- 7.6 m
- Width
- 6.8 m (22.3 ft)
- Lanes
- 2
- Daily Traffic
- 1,727
- Material
- Steel
- Design
- Stringer/Multi-beam or Girder
- Owner
- City or Municipal Highway Agency
- Last Inspected
- N/A
- Est. Improvement
- $43,000
- Total Project Cost
- $54,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.