Sherwood Ln over North Concho River

0.8 Mi S of US 87 · County 431, Texas · Built 2021 · 2 Lanes · 30 vehicles/day

Overall
Good
Deck
7
Good
Superstructure
8
Very Good
Substructure
7
Good

Condition Ratings

ComponentRatingDescription
Deck 7 Good
Superstructure 8 Very Good
Substructure 7 Good

Location

31.803094, -100.943589

This bridge is in worse condition than 86.8% of bridges in County 431. The average bridge in Texas is 0 years old; this one is 5 years old.

Nearby Bridges

Bridge Details

Structure #
072160AA0110005
Year Built
2021
Length
57.9 m (190 ft)
Max Span
21.3 m
Width
9.1 m (29.9 ft)
Lanes
2
Daily Traffic
30
Material
Prestressed Concrete
Design
Stringer/Multi-beam or Girder
Owner
County Highway Agency
Last Inspected
N/A
Est. Improvement
$0
Total Project Cost
$0
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.