US 83 over MILL CREEK RELIEF

6.9 MI N OF FM 1770 · County 399, Texas · Built 1972 · 2 Lanes · 2,538 vehicles/day

Overall
Good
Deck
7
Good
Superstructure
7
Good
Substructure
7
Good

Bridge Details

Structure #
072000003403050
Year Built
1972
Length
36.9 m (121.1 ft)
Max Span
9.1 m
Width
15.3 m (50.2 ft)
Lanes
2
Daily Traffic
2,538
Material
Concrete
Design
Stringer/Multi-beam or Girder
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
N/A
Total Project Cost
N/A
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.