SH 41 over BRANCH OF PAINT CREEK

5.3 MI W OF US 83 · County 385, Texas · Built 1935 · 2 Lanes · 445 vehicles/day

Overall
Fair
Culvert
6
Satisfactory

Condition Ratings

ComponentRatingDescription
Culvert 6 Satisfactory

Location

30.059731, -99.780889

This bridge is in worse condition than 83.3% of bridges in County 385. The average bridge in Texas is 0 years old; this one is 91 years old.

Nearby Bridges

Bridge Details

Structure #
071930020106008
Year Built
1935
Reconstructed
1960
Length
11.3 m (37.1 ft)
Max Span
1.8 m
Width
14.1 m (46.3 ft)
Lanes
2
Daily Traffic
445
Material
Concrete
Design
Culvert
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$3,000
Total Project Cost
$4,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.