IH 10 EB over LOOP 291
4.14 MI E OF SUTTON C/L · County 267, Texas · Built 1978 · 2 Lanes · 5,917 vehicles/day
Overall
Deck
7
Good
Superstructure
7
Good
Substructure
6
Satisfactory
Condition Ratings
| Component | Rating | Description |
|---|---|---|
| Deck | 7 | Good |
| Superstructure | 7 | Good |
| Substructure | 6 | Satisfactory |
Location
30.483031, -100.049317
This bridge is in worse condition than 69.1% of bridges in County 267. The average bridge in Texas is 0 years old; this one is 48 years old.
Nearby Bridges
IH 10 WB over LOOP 291
Built 1978
IH 10 WB over NORTH LLANO RIVER
Built 1980
IH 10 EB over NORTH LLANO RIVER
Built 1980
LP 291 over NORTH LLANO RIVER
Built 1932
LP 291 over IH 10 WB
Built 1978
LP 291 over IH 10 EB
Built 1978
LP 291 over BUCK HOLLOW
Built 1955
IH 10 ML & NFR over DRAW
Built 1980
LP 291 over HARRISON DRAW
Built 1955
LP 291 over IH 10
Built 1980
Bridge Details
- Structure #
- 071340014108162
- Year Built
- 1978
- Length
- 52.1 m (170.9 ft)
- Max Span
- 19.8 m
- Width
- 13.5 m (44.3 ft)
- Lanes
- 2
- Daily Traffic
- 5,917
- Material
- Prestressed Concrete Continuous
- Design
- Stringer/Multi-beam or Girder
- Owner
- State Highway Agency
- Last Inspected
- N/A
- Est. Improvement
- $0
- Total Project Cost
- $0
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.