US 83 over Draw

0.88 MI S OF INT US 87 · County 095, Texas · Built 2016 · 5 Lanes · 4,218 vehicles/day

Overall
Good
Culvert
7
Good

Bridge Details

Structure #
070480003504089
Year Built
2016
Length
6.2 m (20.3 ft)
Max Span
2.4 m
Lanes
5
Daily Traffic
4,218
Material
Concrete
Design
Culvert
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$0
Total Project Cost
$0
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.