FM 119 over Coldwater Creek
4.7 Mi S of SH 15 · County 421, Texas · Built 2023 · 2 Lanes · 465 vehicles/day
Overall
Deck
8
Very Good
Superstructure
8
Very Good
Substructure
8
Very Good
Condition Ratings
| Component | Rating | Description |
|---|---|---|
| Deck | 8 | Very Good |
| Superstructure | 8 | Very Good |
| Substructure | 8 | Very Good |
Location
36.259725, -101.824314
This bridge is in worse condition than 60% of bridges in County 421. The average bridge in Texas is 0 years old; this one is 3 years old.
Bridge Details
- Structure #
- 042110072702009
- Year Built
- 2023
- Length
- 42.7 m (140.1 ft)
- Max Span
- 21.3 m
- Width
- 12.2 m (40 ft)
- Lanes
- 2
- Daily Traffic
- 465
- Material
- Other
- Design
- Other
- Owner
- State Highway Agency
- Last Inspected
- N/A
- Est. Improvement
- $0
- Total Project Cost
- $0
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.