FM 119 over Coldwater Creek

4.7 Mi S of SH 15 · County 421, Texas · Built 2023 · 2 Lanes · 465 vehicles/day

Overall
Good
Deck
8
Very Good
Superstructure
8
Very Good
Substructure
8
Very Good

Condition Ratings

ComponentRatingDescription
Deck 8 Very Good
Superstructure 8 Very Good
Substructure 8 Very Good

Location

36.259725, -101.824314

This bridge is in worse condition than 60% of bridges in County 421. The average bridge in Texas is 0 years old; this one is 3 years old.

Nearby Bridges

Bridge Details

Structure #
042110072702009
Year Built
2023
Length
42.7 m (140.1 ft)
Max Span
21.3 m
Width
12.2 m (40 ft)
Lanes
2
Daily Traffic
465
Material
Other
Design
Other
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$0
Total Project Cost
$0
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.