US 87 over Palo Duro Creek

0.9 Mi E of FM 2589 · County 341, Texas · Built 1935 · 5 Lanes · 4,340 vehicles/day

Overall
Fair
Culvert
6
Satisfactory

Bridge Details

Structure #
041710042502002
Year Built
1935
Reconstructed
2013
Length
10.1 m (33.1 ft)
Max Span
1.2 m
Width
28.8 m (94.5 ft)
Lanes
5
Daily Traffic
4,340
Material
Concrete
Design
Culvert
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$0
Total Project Cost
$0
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.