SH 79 over BRAZOS RIVER

1.2 MI E THROCKMORTON C L · County 503, Texas · Built 2003 · 2 Lanes · 608 vehicles/day

Overall
Good
Deck
7
Good
Superstructure
7
Good
Substructure
7
Good

Bridge Details

Structure #
032520028401014
Year Built
2003
Length
326.1 m (1069.9 ft)
Max Span
32.6 m
Width
14 m (45.9 ft)
Lanes
2
Daily Traffic
608
Material
Prestressed Concrete
Design
Stringer/Multi-beam or Girder
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$0
Total Project Cost
$0
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.