CR260/FULFER ROAD over SOUTH SIDE CANAL
1.20 MI S OF SH 258 · County 485, Texas · Built 1950 · 1 Lanes · 13 vehicles/day
Overall
Deck
5
Fair
Superstructure
5
Fair
Substructure
6
Satisfactory
Condition Ratings
| Component | Rating | Description |
|---|---|---|
| Deck | 5 | Fair |
| Superstructure | 5 | Fair |
| Substructure | 6 | Satisfactory |
Location
33.837167, -98.742378
This bridge is in worse condition than 96.4% of bridges in County 485. The average bridge in Texas is 0 years old; this one is 76 years old.
Nearby Bridges
SH 258 over ANTELOPE CREEK
Built 1939
FM 368 over CALL FIELD CANAL
Built 1947
CR191/HACKER ROAD over ANTELOPE CREEK
Built 2004
SH 258 over DEER CREEK
Built 1939
SH 258 over DRAW
Built 1925
US 277 ML & SBFR over DRAW
Built 2006
US 277SB/US 82 WB over FM 368
Built 2011
US 277NB/US 82 EB over FM 368
Built 2011
US 277 NBFR over DRAW
Built 2006
CR 246/ BRITTON LN over DRAW
Built 2018
Bridge Details
- Structure #
- 032430AA0260001
- Year Built
- 1950
- Length
- 16.2 m (53.1 ft)
- Max Span
- 5.2 m
- Width
- 6.2 m (20.3 ft)
- Lanes
- 1
- Daily Traffic
- 13
- Material
- Prestressed Concrete
- Design
- Other
- Owner
- County Highway Agency
- Last Inspected
- N/A
- Est. Improvement
- $2,000
- Total Project Cost
- $3,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.