FM 2380 over HOLLIDAY CREEK

0.85 MI S OF FM 369 · County 485, Texas · Built 1995 · 5 Lanes · 4,525 vehicles/day

Overall
Good
Deck
7
Good
Superstructure
7
Good
Substructure
7
Good

Bridge Details

Structure #
032430028301023
Year Built
1995
Length
64.9 m (212.9 ft)
Max Span
21.6 m
Width
24.4 m (80.1 ft)
Lanes
5
Daily Traffic
4,525
Material
Prestressed Concrete
Design
Stringer/Multi-beam or Girder
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$0
Total Project Cost
$0
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.