US 281 SB/SH 79 SB over HATTON RD

1.20 MI S OF US 82 · County 485, Texas · Built 1968 · 2 Lanes · 10,421 vehicles/day

Overall
Fair
Deck
6
Satisfactory
Superstructure
7
Good
Substructure
7
Good

Bridge Details

Structure #
032430024901057
Year Built
1968
Length
58.8 m (192.9 ft)
Max Span
25.3 m
Width
12.8 m (42 ft)
Lanes
2
Daily Traffic
10,421
Material
Prestressed Concrete
Design
Stringer/Multi-beam or Girder
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$0
Total Project Cost
$0
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.