FISHER RD over US 82/US 287
1.20 MI E OF SH 79 · County 485, Texas · Built 1967 · 2 Lanes · 1,101 vehicles/day
Overall
Deck
6
Satisfactory
Superstructure
6
Satisfactory
Substructure
6
Satisfactory
Condition Ratings
| Component | Rating | Description |
|---|---|---|
| Deck | 6 | Satisfactory |
| Superstructure | 6 | Satisfactory |
| Substructure | 6 | Satisfactory |
Location
33.884503, -98.430814
This bridge is in worse condition than 72.2% of bridges in County 485. The average bridge in Texas is 0 years old; this one is 59 years old.
Nearby Bridges
FISHER RD over DRAINAGE DITCH
Built 1967
US 82 EB ENT RAMP over DRAINAGE DITCH
Built 1969
HAMMON RD over US 82/US 287
Built 1967
SH 79 SB over SH 79 SB TO US 82 EB CON
Built 1972
SH 79 NB over MKT RAILROAD
Built 1972
SH 79 SB over MKT RAILROAD
Built 1972
US 82 WB/US 287 NB over DRAINAGE DITCH
Built 1967
US 82 EB/US 287 SB over DRAINAGE DITCH
Built 1967
SH 79 NB over US 82 WB/US 287 NB
Built 1972
US 82 WB/US 287 NB over DRAINAGE DITCH
Built 1967
Bridge Details
- Structure #
- 032430004401109
- Year Built
- 1967
- Length
- 63.1 m (207 ft)
- Max Span
- 19.2 m
- Width
- 8.5 m (27.9 ft)
- Lanes
- 2
- Daily Traffic
- 1,101
- Material
- Prestressed Concrete
- Design
- Stringer/Multi-beam or Girder
- Owner
- State Highway Agency
- Last Inspected
- N/A
- Est. Improvement
- $186,000
- Total Project Cost
- $260,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.