US 287 over TRIB OF BUFFALO CREEK

0.13 MI E OF BUS 287 · County 485, Texas · Built 1961 · 8 Lanes · 19,995 vehicles/day

Overall
Fair
Culvert
6
Satisfactory

Bridge Details

Structure #
032430004309077
Year Built
1961
Length
9.4 m (30.8 ft)
Max Span
2.1 m
Lanes
8
Daily Traffic
19,995
Material
Concrete
Design
Culvert
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$0
Total Project Cost
$0
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.