CR 355/ORCHARD RD over BRANCH BRUSHY CREEK

0.1 MI S OF BISHOP RD · County 337, Texas · Built 2007 · 2 Lanes · 66 vehicles/day

Overall
Good
Deck
8
Very Good
Superstructure
7
Good
Substructure
7
Good

Bridge Details

Structure #
031690AA0355002
Year Built
2007
Length
13.7 m (44.9 ft)
Max Span
13.7 m
Width
7.9 m (25.9 ft)
Lanes
2
Daily Traffic
66
Material
Prestressed Concrete
Design
Stringer/Multi-beam or Girder
Owner
County Highway Agency
Last Inspected
N/A
Est. Improvement
$0
Total Project Cost
$0
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.