US 82 WB over Belknap Creek Tributary

2.8 mi. E of US 81 · County 337, Texas · Built 2023 · 2 Lanes · 3,704 vehicles/day

Overall
Good
Deck
7
Good
Superstructure
8
Very Good
Substructure
8
Very Good

Bridge Details

Structure #
031690004404140
Year Built
2023
Length
42.7 m (140.1 ft)
Max Span
21.3 m
Width
12.2 m (40 ft)
Lanes
2
Daily Traffic
3,704
Material
Prestressed Concrete Continuous
Design
Stringer/Multi-beam or Girder
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$0
Total Project Cost
$0
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.