IH 35 NB/SB ML over FM 51

3.0 MI S of US 82 · County 097, Texas · Built 2025 · 4 Lanes · 35,018 vehicles/day

Overall
Good
Deck
8
Very Good
Superstructure
8
Very Good
Substructure
8
Very Good

Bridge Details

Structure #
030490019501215
Year Built
2025
Length
85.3 m (279.9 ft)
Max Span
34.1 m
Width
11.3 m (37.1 ft)
Lanes
4
Daily Traffic
35,018
Material
Prestressed Concrete Continuous
Design
Stringer/Multi-beam or Girder
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$0
Total Project Cost
$0
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.