IH 35 over SCOTT CREEK
0.2 MI S OF FM 1306 · County 097, Texas · Built 1948 · 8 Lanes · 44,371 vehicles/day
Overall
Culvert
6
Satisfactory
Condition Ratings
| Component | Rating | Description |
|---|---|---|
| Culvert | 6 | Satisfactory |
Location
33.586156, -97.165214
This bridge is in worse condition than 59.4% of bridges in County 097. The average bridge in Texas is 0 years old; this one is 78 years old.
Nearby Bridges
IH 35 NB FR over Scott Creek
Built 2024
IH 35 SB FR over Scott Creek
Built 2024
IH 35 over DRAINAGE DITCH
Built 2024
FM 51 over DRAW
Built 1937
FM 51 over SCOTT CREEK
Built 1937
CR 382/SIGN CR 218 over SCOTT CREEK
Built 2005
IH 35 SB over ELM FORK TRINITY RIVER
Built 1963
IH 35 NB over ELM FORK TRINITY RIVER
Built 1947
IH 35 SB FR over Elm Fork Trinity River
Built 2022
FM 2071 over ELM FORK TRINITY RIVER
Built 1960
Bridge Details
- Structure #
- 030490019501025
- Year Built
- 1948
- Reconstructed
- 1963
- Length
- 14.3 m (46.9 ft)
- Max Span
- 1.8 m
- Lanes
- 8
- Daily Traffic
- 44,371
- Material
- Concrete
- Design
- Culvert
- Owner
- State Highway Agency
- Last Inspected
- N/A
- Est. Improvement
- $3,000
- Total Project Cost
- $4,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.