US 82 WB over WHEELER CREEK

0.5 MI W OF FM 371 · County 097, Texas · Built 2013 · 2 Lanes · 9,742 vehicles/day

Overall
Good
Deck
7
Good
Superstructure
8
Very Good
Substructure
7
Good

Bridge Details

Structure #
030490004501260
Year Built
2013
Length
32 m (105 ft)
Max Span
19.8 m
Width
12.2 m (40 ft)
Lanes
2
Daily Traffic
9,742
Material
Prestressed Concrete
Design
Other
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$0
Total Project Cost
$0
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.