CR 246/ BRITTON LN over HOLLIDAY CREEK

3.60 MI S OF US 82 · County 009, Texas · Built 1949 · 2 Lanes · 57 vehicles/day

Overall
Fair
Deck
5
Fair
Superstructure
5
Fair
Substructure
5
Fair

Condition Ratings

ComponentRatingDescription
Deck 5 Fair
Superstructure 5 Fair
Substructure 5 Fair

Location

33.756122, -98.718572

This bridge is in worse condition than 92.8% of bridges in County 009. The average bridge in Texas is 0 years old; this one is 77 years old.

Nearby Bridges

Bridge Details

Structure #
030050AA0246001
Year Built
1949
Length
7.9 m (25.9 ft)
Max Span
7.9 m
Width
6.2 m (20.3 ft)
Lanes
2
Daily Traffic
57
Material
Concrete
Design
Tee Beam
Owner
County Highway Agency
Last Inspected
N/A
Est. Improvement
$72,000
Total Project Cost
$245,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.