FM 2581 over DRAW
7.5 MI SE OF SH 25 · County 009, Texas · Built 1963 · 2 Lanes · 216 vehicles/day
Overall
Culvert
7
Good
Condition Ratings
| Component | Rating | Description |
|---|---|---|
| Culvert | 7 | Good |
Location
33.539339, -98.5617
This bridge is in worse condition than 72.8% of bridges in County 009. The average bridge in Texas is 0 years old; this one is 63 years old.
Nearby Bridges
FM 2581 over ONION CREEK
Built 1961
SH 25 over DOGWOOD CREEK
Built 1929
SH 25 over ONION CREEK
Built 1929
SH 25 over LITTLE ONION CREEK
Built 1929
SH 25 over DRAW
Built 1929
FM 2581 over DRAW
Built 1961
SH 25 over DRAW
Built 1929
SH 25 over W. LITTLE POST OAK CREEK
Built 1929
SH 79 over DRAINAGE DITCH
Built 1931
SH 79 over DOGWOOD CREEK
Built 1928
Bridge Details
- Structure #
- 030050211301004
- Year Built
- 1963
- Length
- 9.1 m (29.9 ft)
- Max Span
- 2.1 m
- Width
- 11.4 m (37.4 ft)
- Lanes
- 2
- Daily Traffic
- 216
- Material
- Concrete
- Design
- Culvert
- Owner
- State Highway Agency
- Last Inspected
- N/A
- Est. Improvement
- $0
- Total Project Cost
- $0
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.