BU 82F over DRAW

1.0 MI E OF FM 368 · County 009, Texas · Built 2023 · 3 Lanes · 2,443 vehicles/day

Overall
Good
Culvert
8
Very Good

Bridge Details

Structure #
030050015605210
Year Built
2023
Length
14.2 m (46.6 ft)
Max Span
3 m
Width
21.9 m (71.9 ft)
Lanes
3
Daily Traffic
2,443
Material
Concrete
Design
Culvert
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$0
Total Project Cost
$0
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.