US 82/277 over BRANCH OF HOLLIDAY CREEK
0.2 Mi. E of Williams Rd · County 009, Texas · Built 2016 · 5 Lanes · 4,468 vehicles/day
Overall
Culvert
7
Good
Condition Ratings
| Component | Rating | Description |
|---|---|---|
| Culvert | 7 | Good |
Location
33.733825, -98.914531
This bridge is in worse condition than 72.8% of bridges in County 009. The average bridge in Texas is 0 years old; this one is 10 years old.
Nearby Bridges
FM 2846 over IRRIGATION CANAL
Built 1966
FM 2846 over BLACKBERRY CREEK
Built 1966
N PARKEY RNCH RD over SLIPPERY CREEK
Built 2008
CR 239 over S SIDE IRRIGATION CANAL
Built 1955
FM 1180 over WICHITA RIVER
Built 1979
EAGLE BEND RD over S SIDE IRRIGATION CANAL
Built 1963
WILSON RANCH RD over HOLLIDAY CREEK
Built 2023
US 281 over DRAW
Built 1929
US 82/277 over Bull Creek
Built 2015
CONTINENTAL RD over S SIDE IRRIGATION CANAL
Built 2012
Bridge Details
- Structure #
- 030050015605208
- Year Built
- 2016
- Length
- 18 m (59.1 ft)
- Max Span
- 3 m
- Lanes
- 5
- Daily Traffic
- 4,468
- Material
- Concrete
- Design
- Culvert
- Owner
- State Highway Agency
- Last Inspected
- N/A
- Est. Improvement
- $0
- Total Project Cost
- $0
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.