CR 2898 - PCT 2 over BRUSHY CREEK

0.9 MI NE OF US 287 · County 497, Texas · Built 1947 · 1 Lanes · 132 vehicles/day

Overall
Fair
Deck
7
Good
Superstructure
6
Satisfactory
Substructure
5
Fair

Bridge Details

Structure #
022490AA0190001
Year Built
1947
Length
15.2 m (49.9 ft)
Max Span
14.6 m
Width
4.9 m (16.1 ft)
Lanes
1
Daily Traffic
132
Material
Steel
Design
Stringer/Multi-beam or Girder
Owner
County Highway Agency
Last Inspected
N/A
Est. Improvement
$159,000
Total Project Cost
$202,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.