Shoshoni Dr over Trib Dosier Creek

0.1 MI N OF CIBOLO HILLS · County 439, Texas · Built 2021 · 2 Lanes · 200 vehicles/day

Overall
Good
Culvert
7
Good

Bridge Details

Structure #
022200ZS4290001
Year Built
2021
Length
14.6 m (47.9 ft)
Max Span
2.4 m
Width
22.5 m (73.8 ft)
Lanes
2
Daily Traffic
200
Material
Concrete
Design
Culvert
Owner
City or Municipal Highway Agency
Last Inspected
N/A
Est. Improvement
$0
Total Project Cost
$0
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.