SMITH-BARRY RD. over TRIB. TO RUSH CREEK

0.1 MI N OF PIONEER PKWY · County 439, Texas · Built 1993 · 2 Lanes · 2,154 vehicles/day

Overall
Fair
Culvert
6
Satisfactory

Bridge Details

Structure #
022200KK0245001
Year Built
1993
Length
15.2 m (49.9 ft)
Max Span
3.7 m
Width
16.6 m (54.5 ft)
Lanes
2
Daily Traffic
2,154
Material
Concrete
Design
Culvert
Owner
City or Municipal Highway Agency
Last Inspected
N/A
Est. Improvement
$0
Total Project Cost
$0
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.