ELM ST over BIG BEAR CREEK

0.13 MI E US 377 S FM1709 · County 439, Texas · Built 1950 · 2 Lanes · 4,806 vehicles/day

Overall
Fair
Deck
5
Fair
Superstructure
6
Satisfactory
Substructure
6
Satisfactory

Bridge Details

Structure #
022200GG0105001
Year Built
1950
Reconstructed
1960
Length
19.2 m (63 ft)
Max Span
9.1 m
Width
10 m (32.8 ft)
Lanes
2
Daily Traffic
4,806
Material
Steel
Design
Stringer/Multi-beam or Girder
Owner
City or Municipal Highway Agency
Last Inspected
N/A
Est. Improvement
$136,000
Total Project Cost
$170,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.