SANDY LANE over IH 30
0.90 MI E OF IH 820 · County 439, Texas · Built 1957 · 2 Lanes · 2,978 vehicles/day
Overall
Deck
6
Satisfactory
Superstructure
7
Good
Substructure
6
Satisfactory
Condition Ratings
| Component | Rating | Description |
|---|---|---|
| Deck | 6 | Satisfactory |
| Superstructure | 7 | Good |
| Substructure | 6 | Satisfactory |
Location
32.759664, -97.197572
This bridge is in worse condition than 73.1% of bridges in County 439. The average bridge in Texas is 0 years old; this one is 69 years old.
Nearby Bridges
MORRISON DRIVE over IH 30
Built 1957
ANDERSON BLVD over TRIB W FORK TRINITY RIV
Built 1984
JOHN T WHITE RD over TRIB W FORK TRINITY
Built 1980
EDERVILLE ROAD over TRIB COTTONWOOD CK
Built 1986
ANDERSON BLVD over TRIB W FORK TRINITY RIV
Built 1984
COOKS LANE over IH 30
Built 1986
CONNECTION D over CONNECTION A B E H
Built 1991
COOKS LANE over TRIB VILLAGE CREEK
Built 1993
COOKS LANE over TRIB COTTONWOOD CREEK
Built 1985
SANDY LANE over COTTONWOOD CREEK
Built 1957
Bridge Details
- Structure #
- 022200106802036
- Year Built
- 1957
- Length
- 72.2 m (236.9 ft)
- Max Span
- 23.8 m
- Width
- 10.8 m (35.4 ft)
- Lanes
- 2
- Daily Traffic
- 2,978
- Material
- Concrete Continuous
- Design
- Tee Beam
- Owner
- State Highway Agency
- Last Inspected
- N/A
- Est. Improvement
- $13,000
- Total Project Cost
- $16,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.