BRYANT IRVIN RD over IH 30
0.3 MI W OF HORNE ST · County 439, Texas · Built 1987 · 4 Lanes · 9,558 vehicles/day
Overall
Deck
7
Good
Superstructure
7
Good
Substructure
7
Good
Condition Ratings
| Component | Rating | Description |
|---|---|---|
| Deck | 7 | Good |
| Superstructure | 7 | Good |
| Substructure | 7 | Good |
Location
32.734431, -97.413503
This bridge is in worse condition than 40.3% of bridges in County 439. The average bridge in Texas is 0 years old; this one is 39 years old.
Nearby Bridges
IH 30 EB over WESTRIDGE AVE
Built 1964
IH 30 WB over WESTRIDGE AVE
Built 1964
HORNE ST over IH 30
Built 1988
IH 30 WB FR over US 377/CAMP BOWIE NB
Built 1988
IH 30 EB ML over US 377/CAMP BOWIE BLVD.
Built 1987
IH 30 WB ML over US 377/CAMP BOWIE BLVD.
Built 1988
IH 30 EB FR over US 377/CAMP BOWIE BLVD.
Built 1988
RIDGLEA AVE. over IH 30
Built 1964
IH30 WB - US377 SB over US 377/CAMP BOWIE NB
Built 1988
MERRICK ST over IH 30
Built 1988
Bridge Details
- Structure #
- 022200106801166
- Year Built
- 1987
- Length
- 61.9 m (203.1 ft)
- Max Span
- 30.8 m
- Width
- 18.9 m (62 ft)
- Lanes
- 4
- Daily Traffic
- 9,558
- Material
- Prestressed Concrete
- Design
- Stringer/Multi-beam or Girder
- Owner
- State Highway Agency
- Last Inspected
- N/A
- Est. Improvement
- $19,000
- Total Project Cost
- $24,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.