FM 156 over Trib to Big Fossil Creek

0.6 Mi S of US 287 · County 439, Texas · Built 2022 · 5 Lanes · 11,709 vehicles/day

Overall
Good
Culvert
7
Good

Bridge Details

Structure #
022200071802367
Year Built
2022
Length
9.1 m (29.9 ft)
Max Span
2.1 m
Width
30.4 m (99.7 ft)
Lanes
5
Daily Traffic
11,709
Material
Concrete
Design
Culvert
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$0
Total Project Cost
$0
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.