FM 156 over Big Fossil Creek
1.6 Mi S of US 287 · County 439, Texas · Built 2022 · 4 Lanes · 15,662 vehicles/day
Overall
Deck
7
Good
Superstructure
8
Very Good
Substructure
8
Very Good
Condition Ratings
| Component | Rating | Description |
|---|---|---|
| Deck | 7 | Good |
| Superstructure | 8 | Very Good |
| Substructure | 8 | Very Good |
Location
32.893611, -97.348197
This bridge is in worse condition than 40.3% of bridges in County 439. The average bridge in Texas is 0 years old; this one is 4 years old.
Nearby Bridges
FM 156 over Big Fossil Creek - 4
Built 2022
Copper Crossing Dr over Trib Big Fossil Creek
Built 2017
ASH MEADOW DR over DRAINAGE DITCH
Built 2014
DARLINGTON TRAIL over DRAINAGE DITCH
Built 2004
FM-3479/HARMON RD over TRIB TO BIG FOSSIL CREEK
Built 1992
Heritage Trace Pky over Trib Big Fossil Creek
Built 2017
WIND DANCER TRAIL over TRIB OF BIG FOSSIL CREEK
Built 2003
HIGH COUNTRY TR over TRIB OF BIG FOSSIL CR
Built 1988
BASSWOOD BLVD over TRIB BIG FOSSIL CREEK
Built 2018
HARMON RD over US 81/US 287
Built 1970
Bridge Details
- Structure #
- 022200071802362
- Year Built
- 2022
- Length
- 274.3 m (899.9 ft)
- Max Span
- 21.3 m
- Width
- 28.3 m (92.8 ft)
- Lanes
- 4
- Daily Traffic
- 15,662
- Material
- Prestressed Concrete
- Design
- Stringer/Multi-beam or Girder
- Owner
- State Highway Agency
- Last Inspected
- N/A
- Est. Improvement
- $0
- Total Project Cost
- $0
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.