SH 121 SB over INTERNATIONAL PKWY SB
1.3 MI. S. OF BASS PRO DR · County 439, Texas · Built 2013 · 4 Lanes · 85,800 vehicles/day
Overall
Deck
7
Good
Superstructure
8
Very Good
Substructure
6
Satisfactory
Condition Ratings
| Component | Rating | Description |
|---|---|---|
| Deck | 7 | Good |
| Superstructure | 8 | Very Good |
| Substructure | 6 | Satisfactory |
Location
32.935397, -97.041331
This bridge is in worse condition than 73.1% of bridges in County 439. The average bridge in Texas is 0 years old; this one is 13 years old.
Nearby Bridges
SH 121 SB Exit Rmp over International Parkway SB
Built 2013
SH 121 FR to 114 E over SH 121 SB Exit Ramp
Built 2013
SH 121 NB to IH635 over DART (COTTONBELT) R/R
Built 2013
INTL PK SB/SH114EB over SH 114 WBGP
Built 2013
SH 121 NB INT.L PK over SH 114 WB TO SH 121 NB
Built 2013
INTL PKWY SB over SH 114
Built 2012
SH121NB to IH635EB over INTL PKY SB to SH 114 EB
Built 2013
INTL SB TO SH114EB over SH 114 ML & INTL PKWY NB
Built 2013
SH 121 SB over SH 114 WB
Built 2012
SH114WB/INT PKY SB over SH 114 & INTL PKWY
Built 2012
Bridge Details
- Structure #
- 022200036401641
- Year Built
- 2013
- Length
- 200.6 m (658.1 ft)
- Max Span
- 42.7 m
- Width
- 21.3 m (69.9 ft)
- Lanes
- 4
- Daily Traffic
- 85,800
- Material
- Prestressed Concrete
- Design
- Stringer/Multi-beam or Girder
- Owner
- State Highway Agency
- Last Inspected
- N/A
- Est. Improvement
- $0
- Total Project Cost
- $0
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.