SH 121 SB over INTERNATIONAL PKWY SB

1.3 MI. S. OF BASS PRO DR · County 439, Texas · Built 2013 · 4 Lanes · 85,800 vehicles/day

Overall
Fair
Deck
7
Good
Superstructure
8
Very Good
Substructure
6
Satisfactory

Bridge Details

Structure #
022200036401641
Year Built
2013
Length
200.6 m (658.1 ft)
Max Span
42.7 m
Width
21.3 m (69.9 ft)
Lanes
4
Daily Traffic
85,800
Material
Prestressed Concrete
Design
Stringer/Multi-beam or Girder
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$0
Total Project Cost
$0
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.