IH 35W N TA at 183 over IH 35W

SH 183 @ IH 35W · County 439, Texas · Built 2022 · 1 Lanes · 3,000 vehicles/day

Overall
Good
Deck
7
Good
Superstructure
8
Very Good
Substructure
7
Good

Bridge Details

Structure #
022200001416631
Year Built
2022
Length
108.8 m (357 ft)
Max Span
40.5 m
Width
7.9 m (25.9 ft)
Lanes
1
Daily Traffic
3,000
Material
Prestressed Concrete
Design
Stringer/Multi-beam or Girder
Owner
Local Toll Authority
Last Inspected
N/A
Est. Improvement
$0
Total Project Cost
$0
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.