IH 820 SBL over GLENVIEW DRIVE
1.0 MI N OF SH 10 · County 439, Texas · Built 1998 · 5 Lanes · 83,641 vehicles/day
Overall
Deck
7
Good
Superstructure
6
Satisfactory
Substructure
7
Good
Condition Ratings
| Component | Rating | Description |
|---|---|---|
| Deck | 7 | Good |
| Superstructure | 6 | Satisfactory |
| Substructure | 7 | Good |
Location
32.823864, -97.205586
This bridge is in worse condition than 73.1% of bridges in County 439. The average bridge in Texas is 0 years old; this one is 28 years old.
Nearby Bridges
IH 820 NB over GLENVIEW DRIVE
Built 1998
IH820 N to 183E ML over IH-820
Built 2014
SH 183 W to 820 SB over IH-820
Built 2014
GLENVIEW DR over CALLOWAY BR
Built 1965
W CHERYL AVE over WALKER BRANCH
Built 2000
IH 820 RAMP K over SH 121
Built 2002
BOOTH CALLOWAY RD over CALLOWAY BRANCH
Built 1985
MELBOURNE RD over WALKER BRANCH
Built 1968
PIPELINE RD over WALKER BRANCH
Built 1960
SH121NB to IH820WB over SH 121 ML & RAMPS
Built 2001
Bridge Details
- Structure #
- 022200000813403
- Year Built
- 1998
- Length
- 89.3 m (293 ft)
- Max Span
- 43.9 m
- Width
- 34.2 m (112.2 ft)
- Lanes
- 5
- Daily Traffic
- 83,641
- Material
- Steel
- Design
- Stringer/Multi-beam or Girder
- Owner
- State Highway Agency
- Last Inspected
- N/A
- Est. Improvement
- $0
- Total Project Cost
- $0
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.