THOMPSON PCT 3 over EAST SANCHEZ CREEK

0.5 MI E OF FM 1884 · County 367, Texas · Built 2002 · 2 Lanes · 1,701 vehicles/day

Overall
Good
Deck
8
Very Good
Superstructure
8
Very Good
Substructure
7
Good

Bridge Details

Structure #
021840AA0438001
Year Built
2002
Length
44.2 m (145 ft)
Max Span
19.8 m
Width
9.8 m (32.2 ft)
Lanes
2
Daily Traffic
1,701
Material
Prestressed Concrete
Design
Stringer/Multi-beam or Girder
Owner
County Highway Agency
Last Inspected
N/A
Est. Improvement
$0
Total Project Cost
$0
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.