THOMPSON PCT 3 over EAST SANCHEZ CREEK
0.5 MI E OF FM 1884 · County 367, Texas · Built 2002 · 2 Lanes · 1,701 vehicles/day
Overall
Deck
8
Very Good
Superstructure
8
Very Good
Substructure
7
Good
Condition Ratings
| Component | Rating | Description |
|---|---|---|
| Deck | 8 | Very Good |
| Superstructure | 8 | Very Good |
| Substructure | 7 | Good |
Location
32.640508, -97.829856
This bridge is in worse condition than 25.8% of bridges in County 367. The average bridge in Texas is 0 years old; this one is 24 years old.
Nearby Bridges
Bethel Rd PCT 3 over Sanchez Creek
Built 1985
FM 1884 over Sanchez Creek
Built 2014
Caballero Ct PCT 3 over Trib Hart Branch
Built 2021
TIN TOP RD PCT 3 over HART BRANCH
Built 1945
HARMONY CIR PCT 3 over TRIB OF THREE MILE BR
Built 1944
FM 51 over SPRING CREEK
Built 1988
FM 51 over HAYDON CREEK
Built 1948
FM 1884 over TRIB OF SANCHEZ BRANCH
Built 1955
Spring Creek PCT 3 over Spring Creek
Built 2019
LUTION DR PCT 3 over EAST SANCHEZ CREEK
Built 2005
Bridge Details
- Structure #
- 021840AA0438001
- Year Built
- 2002
- Length
- 44.2 m (145 ft)
- Max Span
- 19.8 m
- Width
- 9.8 m (32.2 ft)
- Lanes
- 2
- Daily Traffic
- 1,701
- Material
- Prestressed Concrete
- Design
- Stringer/Multi-beam or Girder
- Owner
- County Highway Agency
- Last Inspected
- N/A
- Est. Improvement
- $0
- Total Project Cost
- $0
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.