BAKER RD PCT 3 over MARTIN BRANCH
2.5 MI S OF SH 171 · County 367, Texas · Built 2003 · 2 Lanes · 100 vehicles/day
Overall
Deck
7
Good
Superstructure
7
Good
Substructure
7
Good
Condition Ratings
| Component | Rating | Description |
|---|---|---|
| Deck | 7 | Good |
| Superstructure | 7 | Good |
| Substructure | 7 | Good |
Location
32.605669, -97.727589
This bridge is in worse condition than 25.8% of bridges in County 367. The average bridge in Texas is 0 years old; this one is 23 years old.
Nearby Bridges
BAKER CUTOFF PCT 3 over MARTIN BRANCH
Built 2002
FM 51 over SHAW CREEK
Built 1957
FM 51 over HAYDON CREEK
Built 1948
FM 51 over SPRING CREEK
Built 1988
Spring Creek PCT 3 over Spring Creek
Built 2019
FM 167 over LONG CREEK
Built 1964
TIN TOP RD PCT 3 over HART BRANCH
Built 1945
Caballero Ct PCT 3 over Trib Hart Branch
Built 2021
LITTLE RD - PCT 4 over LONG CREEK
Built 2002
FM 2580 over BRAZOS RIV/E EL CAMINO R
Built 1979
Bridge Details
- Structure #
- 021840AA0432001
- Year Built
- 2003
- Length
- 14.9 m (48.9 ft)
- Max Span
- 7.6 m
- Width
- 7.1 m (23.3 ft)
- Lanes
- 2
- Daily Traffic
- 100
- Material
- Steel Continuous
- Design
- Stringer/Multi-beam or Girder
- Owner
- County Highway Agency
- Last Inspected
- N/A
- Est. Improvement
- $0
- Total Project Cost
- $0