OLD ANNETA RD PCT4 over CLEAR FORK TRINITY

3.8 MI. E. OF FM 5 ANNETA · County 367, Texas · Built 1992 · 2 Lanes · 5,140 vehicles/day

Overall
Fair
Deck
8
Very Good
Superstructure
7
Good
Substructure
6
Satisfactory

Bridge Details

Structure #
021840AA0405001
Year Built
1992
Length
33.2 m (108.9 ft)
Max Span
24.1 m
Width
7.4 m (24.3 ft)
Lanes
2
Daily Traffic
5,140
Material
Steel Continuous
Design
Stringer/Multi-beam or Girder
Owner
County Highway Agency
Last Inspected
N/A
Est. Improvement
$5,000
Total Project Cost
$6,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.