GREENWOOD RD PCT 3 over COFFEE CREEK

4.5 MI W OF US 80 SP 312 · County 367, Texas · Built 1938 · 2 Lanes · 309 vehicles/day

Overall
Fair
Deck
7
Good
Superstructure
6
Satisfactory
Substructure
5
Fair

Bridge Details

Structure #
021840AA0318004
Year Built
1938
Reconstructed
2018
Length
6.4 m (21 ft)
Max Span
5.5 m
Width
8.2 m (26.9 ft)
Lanes
2
Daily Traffic
309
Material
Steel
Design
Stringer/Multi-beam or Girder
Owner
County Highway Agency
Last Inspected
N/A
Est. Improvement
$37,000
Total Project Cost
$46,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.