ERWIN RD PCT 2 over TRIB CLEAR FORK TRINITY

.1 MI. E. OF FM 920 · County 367, Texas · Built 2011 · 2 Lanes · 678 vehicles/day

Overall
Fair
Deck
7
Good
Superstructure
6
Satisfactory
Substructure
6
Satisfactory

Bridge Details

Structure #
021840AA0159002
Year Built
2011
Length
6.7 m (22 ft)
Max Span
6.7 m
Width
7.3 m (24 ft)
Lanes
2
Daily Traffic
678
Material
Steel
Design
Stringer/Multi-beam or Girder
Owner
County Highway Agency
Last Inspected
N/A
Est. Improvement
$0
Total Project Cost
$0
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.