RM 3137 over LAKE CREEK
2.5 MI W OF FM 4 · County 363, Texas · Built 1971 · 2 Lanes · 163 vehicles/day
Overall
Culvert
7
Good
Condition Ratings
| Component | Rating | Description |
|---|---|---|
| Culvert | 7 | Good |
Location
32.663914, -98.306822
This bridge is in worse condition than 41.1% of bridges in County 363. The average bridge in Texas is 0 years old; this one is 55 years old.
Nearby Bridges
FM 4 over TRIB OF PALO PINTO CR
Built 1930
FM 4 over WARD BRANCH
Built 1957
FM 919 over LAKE CK
Built 1988
FM 4 over NEWMAN CREEK
Built 1996
FM 919 over HONEY CREEK
Built 1940
DAVENPORT - PCT 3 over WARD BRANCH
Built 1943
FM 4 over DOANE HOLLOW BRANCH
Built 1957
FM 919 over CARTER BR
Built 1996
FM 4 over PALO PINTO CREEK
Built 1979
FM 919 over EAGLE CREEK
Built 1971
Bridge Details
- Structure #
- 021820320801001
- Year Built
- 1971
- Length
- 25.3 m (83 ft)
- Max Span
- 1.5 m
- Width
- 9 m (29.5 ft)
- Lanes
- 2
- Daily Traffic
- 163
- Material
- Concrete
- Design
- Culvert
- Owner
- State Highway Agency
- Last Inspected
- N/A
- Est. Improvement
- $0
- Total Project Cost
- $0
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.