RM 2692 over TRIB PALO PINTO CREEK

0.6 MI E OF FM 919 · County 363, Texas · Built 1950 · 2 Lanes · 272 vehicles/day

Overall
Fair
Deck
7
Good
Superstructure
7
Good
Substructure
6
Satisfactory

Bridge Details

Structure #
021820285401001
Year Built
1950
Reconstructed
1964
Length
8.2 m (26.9 ft)
Max Span
3.7 m
Width
8.4 m (27.6 ft)
Lanes
2
Daily Traffic
272
Material
Concrete Continuous
Design
Slab
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$81,000
Total Project Cost
$179,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.