FM 4 over BRAZOS RIVER

6.7 MI N OF SH 180 · County 363, Texas · Built 1956 · 2 Lanes · 261 vehicles/day

Overall
Fair
Deck
5
Fair
Superstructure
6
Satisfactory
Substructure
6
Satisfactory

Bridge Details

Structure #
021820073601004
Year Built
1956
Length
268.2 m (879.9 ft)
Max Span
24.4 m
Width
8.9 m (29.2 ft)
Lanes
2
Daily Traffic
261
Material
Steel Continuous
Design
Stringer/Multi-beam or Girder
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$459,000
Total Project Cost
$574,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.