CR 502- PCT 3 over GRASSY CREEK
0.5 MI NE FM 157 N US 67 · County 251, Texas · Built 1993 · 2 Lanes · 9 vehicles/day
Overall
Deck
6
Satisfactory
Superstructure
6
Satisfactory
Substructure
5
Fair
Condition Ratings
| Component | Rating | Description |
|---|---|---|
| Deck | 6 | Satisfactory |
| Superstructure | 6 | Satisfactory |
| Substructure | 5 | Fair |
Location
32.4516, -97.103911
This bridge is in worse condition than 96% of bridges in County 251. The average bridge in Texas is 0 years old; this one is 33 years old.
Nearby Bridges
FM 157 over GRASSY CREEK
Built 2007
CR 506 - PCT 3 over GRASSY BRANCH
Built 1998
US 67 over GRASSY BRANCH
Built 2002
FM 157 over TRIB OF GRASSY BR
Built 1995
US 67 SBML over WEST SOAP CREEK
Built 2001
US 67 NBML over WEST SOAP CREEK
Built 2001
US 67 SBML over SOAP CREEK
Built 2001
US 67 NBML over SOAP CREEK
Built 2001
LAKEVIEW RD over SOAP CREEK TRIBUTARY
Built 2002
US 67 over BREWER CREEK
Built 2002
Bridge Details
- Structure #
- 021270AA0595001
- Year Built
- 1993
- Length
- 20.4 m (66.9 ft)
- Max Span
- 11 m
- Width
- 7.4 m (24.3 ft)
- Lanes
- 2
- Daily Traffic
- 9
- Material
- Steel
- Design
- Stringer/Multi-beam or Girder
- Owner
- County Highway Agency
- Last Inspected
- N/A
- Est. Improvement
- $0
- Total Project Cost
- $0
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.