US 67 NBML over E BUFFALO CK RELIEF

1.4 Mi. E. of SH 174 · County 251, Texas · Built 2016 · 2 Lanes · 9,042 vehicles/day

Overall
Good
Deck
7
Good
Superstructure
7
Good
Substructure
7
Good

Bridge Details

Structure #
021270025906092
Year Built
2016
Length
65.5 m (214.9 ft)
Max Span
36.9 m
Width
12.2 m (40 ft)
Lanes
2
Daily Traffic
9,042
Material
Prestressed Concrete
Design
Stringer/Multi-beam or Girder
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$0
Total Project Cost
$0
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.