US 67 NB over SH 174

Over SH 174 · County 251, Texas · Built 2018 · 2 Lanes · 7,791 vehicles/day

Overall
Good
Deck
7
Good
Superstructure
8
Very Good
Substructure
8
Very Good

Bridge Details

Structure #
021270025906089
Year Built
2018
Length
97.2 m (318.9 ft)
Max Span
33.5 m
Width
13.5 m (44.3 ft)
Lanes
2
Daily Traffic
7,791
Material
Prestressed Concrete
Design
Stringer/Multi-beam or Girder
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$0
Total Project Cost
$0
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.