FM 2210 over TWO BUSH BRANCH

0.8 MI W OF US 281 · County 237, Texas · Built 1995 · 2 Lanes · 125 vehicles/day

Overall
Good
Culvert
7
Good

Bridge Details

Structure #
021200221202004
Year Built
1995
Length
52.7 m (172.9 ft)
Max Span
4.3 m
Lanes
2
Daily Traffic
125
Material
Concrete
Design
Culvert
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$0
Total Project Cost
$0
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.