Clark Dr. over Branch of Sandy Creek

0.1 Mi NW of SH 19 · County 379, Texas · Built 1920 · 1 Lanes · 220 vehicles/day

Overall
Fair
Deck
6
Satisfactory
Superstructure
6
Satisfactory
Substructure
6
Satisfactory

Condition Ratings

ComponentRatingDescription
Deck 6 Satisfactory
Superstructure 6 Satisfactory
Substructure 6 Satisfactory

Location

32.878172, -95.764217

This bridge is in worse condition than 67.9% of bridges in County 379. The average bridge in Texas is 0 years old; this one is 106 years old.

Nearby Bridges

Bridge Details

Structure #
011900C00025001
Year Built
1920
Length
6.7 m (22 ft)
Max Span
6.4 m
Width
5.6 m (18.4 ft)
Lanes
1
Daily Traffic
220
Material
Concrete
Design
Slab
Owner
City or Municipal Highway Agency
Last Inspected
N/A
Est. Improvement
$1,000
Total Project Cost
$1,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.