Center St. over Smith Creek

0.2 Mi E of FM 79 · County 277, Texas · Built 1979 · 2 Lanes · 1,341 vehicles/day

Overall
Fair
Culvert
6
Satisfactory

Bridge Details

Structure #
011390B00135002
Year Built
1979
Length
11.9 m (39 ft)
Max Span
2.7 m
Width
13.7 m (44.9 ft)
Lanes
2
Daily Traffic
1,341
Material
Concrete
Design
Culvert
Owner
City or Municipal Highway Agency
Last Inspected
N/A
Est. Improvement
$39,000
Total Project Cost
$49,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.