CR 574 (27100) over Snow Creek
0.9 Mi E of FM 824 · County 277, Texas · Built 1992 · 2 Lanes · 20 vehicles/day
Overall
Deck
7
Good
Superstructure
7
Good
Substructure
5
Fair
Condition Ratings
| Component | Rating | Description |
|---|---|---|
| Deck | 7 | Good |
| Superstructure | 7 | Good |
| Substructure | 5 | Fair |
Location
33.502864, -95.820222
This bridge is in worse condition than 89.8% of bridges in County 277. The average bridge in Texas is 0 years old; this one is 34 years old.
Nearby Bridges
FM 824 over SNOW CREEK
Built 1995
FM 824 over WAFER CREEK
Built 2005
CR 584 (27300) over Whittenburg Creek Branch
Built 2013
CR 26100 over Ghost Creek
Built 2006
FM 824 over GHOST CREEK
Built 1995
CR 584 (27300) over Whittenburg Creek
Built 2005
CR 576 (26320) over Noble Creek
Built 2003
CR 26300 over TRIB OF GHOST CREEK
Built 2021
CR 26050 over MORRISON CREEK
Built 2021
FM 38 over NORTH SULPHUR RIVER REL
Built 1949
Bridge Details
- Structure #
- 011390AA0574001
- Year Built
- 1992
- Length
- 42.7 m (140.1 ft)
- Max Span
- 21.3 m
- Width
- 7.9 m (25.9 ft)
- Lanes
- 2
- Daily Traffic
- 20
- Material
- Prestressed Concrete
- Design
- Stringer/Multi-beam or Girder
- Owner
- County Highway Agency
- Last Inspected
- N/A
- Est. Improvement
- $416,000
- Total Project Cost
- $520,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.