CR 499 (35010) over Cottonwood Creek

1.3 Mi W of US 82 · County 277, Texas · Built 1996 · 2 Lanes · 10 vehicles/day

Overall
Fair
Culvert
5
Fair

Bridge Details

Structure #
011390AA0499001
Year Built
1996
Length
11.6 m (38.1 ft)
Max Span
3 m
Width
8.4 m (27.6 ft)
Lanes
2
Daily Traffic
10
Material
Concrete
Design
Culvert
Owner
County Highway Agency
Last Inspected
N/A
Est. Improvement
$28,000
Total Project Cost
$35,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.